Building new relationships

We were invited along to survey and recommend solutions to ongoing issues at Gloucester cathedral on their rising bollards.

Closer inspections gave us an idea as to what was needed to ensure the ongoing issues were eradicated.

  • Traffic lights added
  • 2x safety loops
  • 1x free exit loop reinstated

Don't miss these stories: